North Wooton Pump and Pre-Cast Concrete Units Supply
Deadline:20 Oct 2026, 12:00
Tender information
Peterborough
Cambridgeshire CC
Suffolk
Norwich and East Norfolk
North and West Norfolk
Breckland and South Norfolk
Type
Prior information
Procedure
Not given
Ref. number
727
Estimated value
£468,000
Duration
05/11/2026 - 01/09/2027
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project.
The value is estimated at circa £390,000 total. These figures are exclusive of VAT.
The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage.
The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual.
The Water Management Alliance (WMA) will oversee this procurement on behalf of the King’s Lynn Internal Drainage Board working with Turner & Townsend as advisors.
Buyer
Kings Lynn Internal Drainage Board
Documents
Buyer
Kings Lynn Internal Drainage Board
Open for offers
30 days left
Important dates
18 Sept - Publication date
20 Oct - Deadline