Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722
Deadline:10 Jul 2026, 10:00
Tender information
Denmark
Type
Contract
Procedure
Negotiated with a call for competition
Ref. number
716721
Estimated value
DKK 147,000,000
Duration
6 months
The Contracting Authority wants to purchase horizontal directional drilling activities including installation of PE-pipes for establishing two sets of cable crossings for new 145 kV cable sys-tems and fiber connections across Guldborgsund (two pipe sets, two cable systems, LOT 1) and Roskilde Fjord (one pipe set, one cable system, LOT 2).
The underground power cables will be installed by another Contractor by means of Watucab by utilizing the smaller pipes inside a bigger pipe. The Fibre Optical Cables (FOC) will be installed in dedicated pipes for this purpose. This tender concerns all pipes involved – both the smaller pipes and the bigger pipe on the outside.
For further details regarding the purchase, reference is made to the tender documents.
The value of the contracts is expected to amount to total 147 Mio. DKK
The tender is divided into the following lots:
Lot 1:
Cable crossings for new 145 kV cable systems and fiber connections across Guldborgsund. Two pipe sets, two power cable systems
oPipe #1 from Falster to Lolland. Estimated length 1,254 m
oPipe #2 from Falster to Lolland. Estimated length 1,207 m
Lot 2: Cable crossings for new 145 kV cable systems and fiber connections across
Roskilde Fjord: One pipe set, one power cable system
oPipe #1 from Roskilde Fjord West – East landings. Estimated length 1,755 m
Tenders can be submitted for one or all partial agreements
Lot 1 - Cable crossings for new 145 kV cable systems and fiber connections across Guldborgsund
Two pipe sets, two power cable systems oPipe #1 from Falster to Lolland. Estimated length 1,254 m oPipe #2 from Falster to Lolland. Estimated length 1,207 m
Lot 2 - Cable crossings for new 145 kV cable systems and fiber connections across Roskilde Fjord
Roskilde Fjord: One pipe set, one power cable system oPipe #1 from Roskilde Fjord West – East landings. Estimated length 1,755 m Tenders can be submitted for one or all partial agreements
Buyer
Energinet Eltransmission A/S
Documents
Buyer
Energinet Eltransmission A/S
No time limit
24 days left
Important dates
18 May - Publication date
10 Jul - Deadline