SC0150 Scottish Canals Contractor Works Framework
Lot 1 – Civils including design
Lot 1 - Civils including design(including site set-up and primary emergency response)
Lot 2 – Landscaping including design
Lot 2 – Landscaping including design
Lot 3 – Hydrographic and Topographic Survey / Site Investigation / Ground Investigation
Lot 3 – Hydrographic and Topographic Survey / Site Investigation / Ground Investigation
Lot 4 – MEICA including design - (Mechanical / Hydraulic / Electrical / Controls / Telemetry)
Lot 4 – MEICA including design - (Mechanical / Hydraulic / Electrical / Controls / Telemetry)
Lot 5 – Fabrication
Lot 5 – Fabrication
Lot 6 – Dredging
Lot 6 – Dredging
Lot 7 - Regional Construction Works
Lot 7 - Regional Construction Works – This lot is split up into regional sub lots as below: Lot 7a – Lowlands Lot 7b – Caley Lot 7c - Crinan
Lot 8 - Professional Service - Engineering and Built Environment
Lot 8 - Professional Service - Engineering and Built Environment (this lot is sub divided into lots 8a & 8b) Lot 8a - Professional Service - General (no Reservoirs) Lot 8b - Professional Service - Reservoirs