Dargavel Burn Restoration Project - Developed & Technical Design Stages (RIBA 3 &4)

Deadline:9 Oct 2026, 10:00

Tender information
Inverclyde, East Renfrewshire and Renfrewshire
Type
Contract
Procedure
Restricted procedure
Ref. number
WEF_Dargavel_RIBA_3&4
Estimated value
£350,000
Duration
12 months
Green Action Trust wishes to appoint a suitably qualified Consultant to deliver the Developed and Technical Design stages (RIBA 3 and 4) for the Dargavel Burn Restoration and Weir Removal Project. The commission may be extended to provide preparation and supervision of the RIBA 5 Works procurement and delivery stages respectively.

The Consultant shall deliver Developed and Technical Designs (RIBA Stages 3 and 4), producing a multidisciplinary, build-ready design based on the Concept Design (RIBA 2). Services will include delivering the river restoration Developed and Technical Designs (RIBA 3 and RIBA 4) incorporating biodiversity and landscape improvements, ecological and environmental assessments, flood modelling ensuring no increase in flood risk, meaningful stakeholder engagement, preparation of statutory consents (including EASR and Planning Permission), and the production of NEC4 tender documentation for the build stage (RIBA 5). Design will take into account all relevant constraints, most importantly contaminated land, flood risk and ecological sensitivities. Design decisions will be logged demonstrating that constraints and risks have been acceptably designed out of the final Technical Designs suitable for build. Current funding allows for the procurement of services for Developed and Technical Designs (RIBA Stages 3 and 4) to allow for a Construction tender to be compiled. It is expected that the appointed Consultant may also support procurement and provide professional services during the construction phase (RIBA Stage 5), including NEC4 Principal Project Manager, Principal Designer, and Supervisor duties, together with ecological and geomorphological supervision. An Indicative Scope of Services is included in Appendix 1 of the Pre-Qualification Questionnaire. Overall, the Consultant's role is to take the project from Concept Design through to completion of Technical Design (RIBA 4), secure all necessary approvals and permissions, undertake required surveys and investigations, prepare works tender documentation, and support successful delivery through construction.

Buyer
Green Action Trust
buyer-email@mail.com
organization number

Documents

Document name
Upload date
File size
First document.pdf1 Jan 1970, 00:001 Bytes
Second document.pdf1 Jan 1970, 00:001 Bytes
Open for offers
16 days left
Important dates
21 Sept - Publication date
9 Oct - Deadline
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?