Repair activities for TPP 2026 Specialized labor service

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 1

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 1 in Thermal Power Plant

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 2

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 2 in Thermal Power Plant

Specialized labor for the overhaul of mill plant no. 3 complete with separator, compensator

Specialized labor for the overhaul of mill plant no. 3 complete with separator, compensator in Thermal Power Plant

Specialized labor for the overhaul of mill plant no. 4 complete with separator, compensator

Specialized labor for the overhaul of mill plant no. 4 complete with separator, compensator in Thermal Power Plant

Specialized labor for the overhaul of mill plant no. 5 complete with separator, compensator

Specialized labor for the overhaul of mill plant no. 5 complete with separator, compensator in Thermal Power Plant

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 6

Specialized labor for the repair of the trolley, compensator, transmission, pressure channel no. 6 in Thermal Power Plant

Specialized labor for coal dispenser repair

Specialized labor for coal dispenser repair in Thermal Power Plant

Specialized labor for the repair of a forced draft fan

Specialized labor for the repair of a forced draft fan in Thermal Power Plant

Specialized labor for roof repairs

Specialized labor for roof repairs in Thermal Power Plant

Specialized labor for regenerative air heater (Lungstreem)

Specialized labor for regenerative air heater (Lungstreem) in Thermal Power Plant

Specialized labor for a slag remover

Specialized labor for a slag remover in Thermal Power Plant

Specialized labor for water heater

Specialized labor for water heater in Thermal Power Plant

Specialized labor for Penetration Testing

Specialized labor for Penetration Testing in Thermal Power Plant

Super control

Super control in Thermal Power Plant

Specialized labor for measuring pipe thicknesses

Specialized labor for measuring pipe thicknesses in Thermal Power Plant

Specialized labor for replacing pipes and elbows on a boiler piping system

Specialized labor for replacing pipes and elbows on a boiler piping system in Thermal Power Plant

Specialized labor for servicing devices for transporting, unloading and loading coal

Specialized labor for servicing devices for transporting, unloading and loading coal in Thermal Power Plant

Specialized labor for reinforcement in auxiliary facilities

Specialized labor for reinforcement in auxiliary facilities in Thermal Power Plant

Specialized labor for centrifugal, gear and screw pumps

Specialized labor for centrifugal, gear and screw pumps in Thermal Power Plant

Specialized labor for dismantling, testing, auditing and cleaning of cold storage facilities

Specialized labor for dismantling, testing, auditing and cleaning of cold storage facilities in Thermal Power Plant

Specialized labor for dismantling and installing a butterfly valve and compensator to a cooling pump

Specialized labor for dismantling and installing a butterfly valve and compensator to a cooling pump in Thermal Power Plant

Specialized labor for auxiliary boiler room (boiler 1 and 2, pressure and suction fan and dampers in auxiliary boiler room)

Specialized labor for auxiliary boiler room (boiler 1 and 2, pressure and suction fan and dampers in auxiliary boiler room) in Thermal Power Plant

Specialized labor for hydro-deashing

Specialized labor for hydro-deashing in Thermal Power Plant

Specialized labor for the construction of drums and reducers for conveyor belts 1 and 2

Specialized labor for the construction of drums and reducers for conveyor belts 1 and 2 in Thermal Power Plant

Specialized labor for Boiler Sealing OB380

Specialized labor for Boiler Sealing OB380 in Thermal Power Plant

Specialized labor for replacing the Electro filter cover

Specialized labor for replacing the Electro filter cover in Thermal Power Plant

Buyer
JSC “Power Plants of North Macedonia”-TPP Oslomej
buyer-email@mail.com
organization number

Documents

Document name
Upload date
File size
First document.pdf
1 Jan 1970, 00:001 Bytes
Second document.pdf
1 Jan 1970, 00:001 Bytes
Deadline passed
Important dates
18 May - Publication date
15 Jun - Deadline
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?

Mercell Logo

Feel free to reach out!

Mercell is the leading European provider of e-tendering and procurement systems, and information between buyers and suppliers in the professional market.

We appreciate your input.

© Mercell Group 2026

Terms & Conditions and Privacy Notice

Mercell Group

  • Email: post@mercell.com
  • Phone: +47 21 01 88 00
  • Address: Askekroken 11, 0277 Oslo, Norway

Your privacy is important to us

We use cookies to improve your experience and evaluate each item on our site. By clicking further, you accept our use of cookies.