Rehabilitation of 11 Steel Bridges on the “Vrbnica – Bar” railway line in Montenegro
Rehabilitation of 9 Steel Bridges
Rehabilitation of 9 Steel Bridges: Bridge Lim III (km 289+460.48, L = 395.5 m); Bridge Ljubovida (km 311+510.59, L = 454 m); Bridge Skrbusa (km 343+704.98, L = 207 m); Bridge Tara III (km 346+903.46, L = 120 m); Bridge Vuce Potok (km 358+076.67, L = 275.4 m); Bridge Krusevacki Potok (km 367+421.95, L = 85.2 m); Bridge Dubocica (km 369+504.39, L = 109 m); Bridge Mala Rijeka (km 385+489.39, L = 498.8 m); and Bridge Tanki Rt (km 429+284.32, L = 201.7 m). The works include foundation repair; repair, protection and reinforcement of concrete columns; repair of the reinforced concrete pavement slab; repair and reinforcement of the steel structure; repair of the bedding and securing of the stationary supports; corrosion protection and fatigue testing; expansion joints and elastomeric expansion strips; works on the upper machinery; waterproofing, drains and drainage; climbing aids and inspection paths; channels for installations; bridge lighting; monitoring; and works on the road surface.
Rehabilitation of 2 Steel Bridges
Lot#2, Rehabilitation of 2 Steel Bridges: Kosorski Žlijeb Bridge (km 391+846.06, L = 70 m) and Vujisića Most Bridge (km 312+557.93, steel section L = 42 m, concrete arch section L = 34 m). The works include preparatory works, structural repair and strengthening of steel elements, concrete and reinforcement works, repair of bridge foundations and bearings, drainage, corrosion protection and bridge lighting.