Design & Build of Long Welded Rail Trains

Deadline:N/A

Tender information
United Kingdom
Type
Prior information
Procedure
Not given
Ref. number
47035
Estimated value
£140,153,344.43
Duration
31/07/2028 - 31/07/2030
Network Rail's existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered. Network Rail currently anticipates a future requirement for: • A fleet of approximately 8 + 3 LWRTs. • A locomotive-hauled solution capable of both rail delivery and rail recovery activities. • A solution capable of carrying a minimum of 24 rails per train. • Remote operation of rail handling equipment to minimise manual intervention and improve operational safety. Engagement was undertaken with the market to date has identified several opportunities for consideration as part of the sourcing strategy and technical requirements, including separate procurement of wagons and material handling equipment (MHE), and the development of a modular design making use of intermodal wagons. This procurement shall be for the Manual Handling Equipment, design and build, as a modular solution. This will then be entegrated with the chosen UK approved wagon to ultimatley build the LWRT.

Design & Build of Long Welded Rail Trains

Network Rail´s existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered. Network Rail currently anticipates a future requirement for: • A fleet of approximately 8 + 3 LWRTs. • A locomotive-hauled solution capable of both rail delivery and rail recovery activities. • A solution capable of carrying a minimum of 24 rails per train. • Remote operation of rail handling equipment to minimise manual intervention and improve operational safety. Engagement was undertaken with the market to date has identified several opportunities for consideration as part of the sourcing strategy and technical requirements, including separate procurement of wagons and material handling equipment (MHE), and the development of a modular design making use of intermodal wagons. This procurement shall be for the Manual Handling Equipment, design and build, as a modular solution. This will then be entegrated with the chosen UK approved wagon to ultimatley build the LWRT.

Buyer
NETWORK RAIL INFRASTRUCTURE LIMITED
buyer-email@mail.com
organization number
No time limit
Important dates
30 Jul - Publication date
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?