RN: 70520V - CASWS - Castleisland Community College, Castleisland Co. Kerry. - Science Lab Refurbishment/Upgrade
Deadline:N/A
Tender information
South-West
Type
Prior information
Procedure
Unknown
Estimated value
€200,000
Planned procedure start date
29 May 2026 00:00
Contract type
Dynamic purchasing system
Proposed Scope of Works
Castleisland Community College comprises of a single storey main building with standalone boiler house and electrical switch room originally constructed in 1987 with a gross floor area of approximately 2,544m2 as shown in the school plan included at Figure 1 below.
The proposed Climate Action Summer Works Project is for a Category 5 Science Labs upgrade including Gas Works. The existing Science Lab extends to a gross floor area of approximately
100m2 comprising: -
• Main Science Lab
• Preparation Room
• Storeroom
The proposed project is to upgrade the Science Lab in accordance with the current Department of Education TGD 003 and TGD 031 and the current template Science Lab layout in so far as is practical working within the physical constraints of the existing room layout.
The school gross floor area is approximately 2,544 m2. The proposed project relates to a Category 5 upgrade to the Science Lab which has a gross floor area of 100m2. The science lab furniture equipment and flooring all date from the original 1987 school construction and have passed end of economic life and require full upgrade replacement and room refurbishment to current TGD standard in order to enable the school to deliver the current science curriculum effectively – refer to Photo 1 to Photo 6 attached.
The Teachers workstation is very unsatisfactory with a raised platform and a step which is a trip hazard refer to Photo 1.
There are very inadequate / inappropriate storage units with glass vessels being stored on open shelving – refer to Photo 3 and chemicals also on open shelving as shown in Photo 5. The fume cupboard shown in Photo 2 is not functional and the fume extract ventilation is no longer operational, and several of the lab sink taps and gas taps are defective and have been isolated.
Proposed Schedule of Works
Item Description
1 Preliminaries
2 Main Demolitions & Strip Out
3 Chasing, coring and opening up for new services
4 Construct new U/G Ducts for Services to Island Units
5 Alterations to tie into U/G drainage in Courtyard
6 New Accessible width Fire Doors
7 New Vinyl Flooring to Lab, Prep Room and Store
8 New Splashback Ceramic Wall Tiles
9 Painting and redecoration to Lab, Prep Room & Store
10 Builders attendance on M&E & Furniture Specialist
11 Mechanical Isolations & Strip Out
12 New Above Ground Soils and Wastes
13 New Water Services to Pods and Sinks
14 New gas services to Pods and Prep Room
15 New gas pressure proving safety systems
16 Alterations to heating distribution system
17 Fume hood & Chemical store Extract ventilation
18 Electrical Isolations and Strip Out
19 New Science Lab Sub Board
20 New General Service & Equipment Power
21 Alterations to lighting and emergency lighting
22 New ICT Services
23 Alterations to Fire Alarm & Interface to Gas
24 New Fitted Laboratory Furniture & Equipment
25 New Fume Cupboard
26 New Loose Furniture Table and Lab Stools
Note The above schedule is an overview of the works to be carried out
RN:70520V - CASWS-Castleisland CC - Science Lab Refurbishment/Upgrade
CASWS - Science Lab Refurbishment/Upgrade
Buyer
Kerry Education and Training Board
Documents
Buyer
Kerry Education and Training Board
No time limit
Important dates
18 May - Publication date
29 May - Planned procedure start date