Maintenance and Repair of the CSID
The supplier is required to provide a Baseline Asset Survey / Report and Maintenance Schedule. General Maintenance duties will include washing of the CSID, inspections, measurements and photographic records. Removal of mooring buoys and/or Dunlop fenders. Mooring Equipment Condition Reports. Replacement of CSID Gate Strops. Dunlop Fender Pressure Checks. Maintenance of Gate Mooring Buoys, Hook Swivels and Hinge Swivels. Identification of Mooring defects. Facilitation of stakeholder inspections via suitable contractor provided vessels. Supply and installation of 5x Barrier Floats (25m length 2.35m diameter). Supplier will sub-contract an independent inspection report of the CSID in year two of the contract, facilitating the raising of all mooring buoys to be inspected. Contractor will provide copies of testing and commissioning certificates for new/repaired CSID components. Supplier is required to provide necessary personnel, vehicles, and equipment to enable transportation. The Contractor must provide a point of contact available 24 hours per day, 7 days per week, 365 days per year to function as the First Level response contact to provide telephone support.