IT Infrastructure Framework

Deadline:N/A

Tender information
East Kent
Type
Contract
Procedure
Not given
Ref. number
ocds-h6vhtk-06df10
Contract type
Framework agreement
Duration
31/12/2026 - 01/01/2030
Dover Harbour Board intend to establish an IT Infrastructure Framework centred around 4 Lots: 1. Access Control 2. CCTV 3. Data Cabling & Infrastructure 4. Radio Infrastructure – Lot nr.: 1 Data Cabling & Infrastructure Supply, installation, repairs, testing and maintenance to assets such as fibre optic cabling, CAT6a cabling and signalling cabling Duration contract start date : 01/01/2027 12:00:00 AM Duration contract end date : 01/01/2030 11:59:59 PM Criteria definitions: Quality: 40 (Quality) Price: 60 (Commercial) – Lot nr.: 2 CCTV Infrastructure The successful tenderer(s) shall be capable of supplying, installing, terminating, testing and commissioning CCTV cabling and associated hardware. The works may include CCTV equipment required to interface with existing FLIR/DVTEL IP CCTV systems, Automatic Number Plate Recognition (ANPR) solutions and standalone digital CCTV systems. All installations shall be fully configured, tested and commissioned to confirm compatibility and satisfactory operation with the relevant CCTV system. Duration contract start date : 01/01/2027 12:00:00 AM Duration contract end date : 01/01/2030 11:59:59 PM Criteria definitions: Quality: 40 (Quality) Price: 60 (Commercial) – Lot nr.: 3 Radio Infrastructure The types of works and assets to be affected include, though are not limited to, the following: Radio Systems, Radar and Navigational Equipment The Contractor shall provide installation, testing, commissioning, maintenance and repair services for radio, radar and navigational systems and associated equipment. The works may include, but shall not be limited to: Trunked Radio Systems Installation, maintenance and repair of trunked radio systems, including Motorola systems and associated equipment, cabling and interfaces. Radar Systems Installation, maintenance and repair of radar systems, including associated control and signal cabling, waveguides and other interfacing cables and equipment. Vessel-Mounted Navigational Aids Installation, testing, commissioning, maintenance and repair of vessel-mounted navigational aids and associated equipment. Meteorological Sensors Installation, testing, commissioning, maintenance and repair of meteorological sensors and associated equipment, cabling and interfaces. Duration contract start date : 01/01/2027 12:00:00 AM Duration contract end date : 01/01/2030 11:59:59 PM Criteria definitions: Quality: 40 (Quality) Price: 60 (Commercial) – Lot nr.: 4 Access Control Infrastructure The works may include, but shall not be limited to, the supply, installation, repair and maintenance of the following: Shielded-pair cabling; Low-voltage magnetic-lock cabling; Access-control reader cabling; Low-voltage control-system cabling; Door-release devices; Emergency break-glass units; Access-control readers; and Associated hardware and system interfaces. Duration contract start date : 01/01/2027 12:00:00 AM Duration contract end date : 01/01/2030 11:59:59 PM Criteria definitions: Quality: 40 (Quality) Price: 60 (Commercial)
Buyer
Dover Harbour Board
buyer-email@mail.com
organization number

Documents

Document name
Upload date
File size
First document.pdf1 Jan 1970, 00:001 Bytes
Second document.pdf1 Jan 1970, 00:001 Bytes
No time limit
Important dates
27 Aug - Publication date
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?

Your privacy is important to us

We use cookies to improve your experience and evaluate each item on our site. By clicking further, you accept our use of cookies.