PIN Notice for Civil and Structural Works at Bakki Substation

Deadline:N/A

Tender information
Landsbyggð
Type
Periodic indicative
Procedure
Not specified
Duration
28/02/2027 - 28/02/2028
Description of the Works The project involves modifications to the existing switchgear hall at Bakki Substation, as well as the construction of a new transformer building adjacent to the existing substation. The modifications to the existing switchgear hall, which has a floor area of approximately 787 m², include the removal of the existing external wall cladding, installation of new insulated sandwich panels, and subsequent reinstallation of the original cladding. The works also include the construction of a new cast-in-situ reinforced concrete cable basement and floor slab. A new transformer building with a floor area of approximately 360 m² will be constructed adjacent to the existing substation building. The new building will accommodate two separate transformer bays and will consist of cast-in-situ reinforced concrete walls with an exposed concrete finish and a structural steel roof framework. Main Scope of Works The works are expected to include, but are not limited to: Demolition and removal works Earthworks and excavation Cast-in-situ reinforced concrete works External wall cladding and insulation Plumbing and drainage installations Heating, ventilation and mechanical installations Electrical installations Location of Works: Bakki, Húsavík, Iceland Anticipated Construction Period: March 2027 – February 2028 Expected Publication of Contract Notice: Mid-January 2027 – The project involves modifications to the existing switchgear hall at Bakki Substation, as well as the construction of a new transformer building adjacent to the existing substation. The modifications to the existing switchgear hall, which has a floor area of approximately 787 m², include the removal of the existing external wall cladding, installation of new insulated sandwich panels, and subsequent reinstallation of the original cladding. The works also include the construction of a new cast-in-situ reinforced concrete cable basement and floor slab. A new transformer building with a floor area of approximately 360 m² will be constructed adjacent to the existing substation building. The new building will accommodate two separate transformer bays and will consist of cast-in-situ reinforced concrete walls with an exposed concrete finish and a structural steel roof framework. Main Scope of Works The works are expected to include, but are not limited to: Demolition and removal works Earthworks and excavation Cast-in-situ reinforced concrete works External wall cladding and insulation Plumbing and drainage installations Heating, ventilation and mechanical installations Electrical installations
Buyer
Landsnet hf
buyer-email@mail.com
organization number
No time limit
Important dates
13 Nov - Publication date
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?