District Heating Installation Framework
Heat Substation Installation
Aberdeen Heat and Power (AHP) operate a number of district heat networks across Aberdeen. These networks are planned to expand over time with the connection of additional buildings. AHP is seeking to establish a framework agreement with up to three suitably qualified and experienced contractors for the supply and installation of thermal substations to connect buildings to AHP’s district heat networks. This lot will be used to instruct thermal substation installation works on an as-and-when-required basis over the framework term, in response to new connections as they are identified, secured, or brought forward for development.
Civils works for the excavation, backfilling and reinstatement of buried pipework trench
Aberdeen Heat and Power (AHP) operates a number of district heat networks across Aberdeen. These networks are planned to expand over time with the connection of additional buildings. AHP is seeking to establish a framework agreement with up to three qualified and experienced civils contractors for trench excavation and backfilling, and surface reinstatement, related to the installation of buried pre-insulated heat network pipework between the AHP district heat networks and connecting buildings. This lot will be used to instruct civils excavation and backfilling/reinstatement works on an as-and-when-required basis over the framework term, in response to new heat network connections as they are identified, secured, or brought forward for development.
Supply and installation of buried pipework
Aberdeen Heat and Power (AHP) operates a number of district heat networks across Aberdeen. These networks are planned to expand over time with the connection of additional buildings. AHP is seeking to establish a framework agreement with up to three qualified and experienced contractors for the supply and installation of pre-insulated buried pipework between the AHP district heat networks and connecting buildings. This lot will be used to instruct buried pipework and associated communications duct installation works on an as-and-when-required basis over the framework term, in response to new connections as they are identified, secured, or brought forward for development.