PRO010474 The Supply of Valves and Hydrants
Deadline:30 Apr 2027, 11:00
Tender information
United Kingdom
Type
Prior information
Procedure
Not given
Ref. number
PRO010474
Contract type
Framework agreement
Duration
31/07/2027 - 01/08/2030
United Utilities require the supply of metallic valves and ancillary equipment including the design, manufacture, delivery to and off-loading at site, provision of drawings, operation and maintenance manuals, technical data sheets and factory test certification for all items included.
The scope of supply includes but is not limited to the following;
Gate valves
Butterfly valves
Non return valves
Air / gas release valves
Plug valves
Fire hydrants
Penstocks
In line check valves (used on combined sewer overflow outfalls for example)
Valve and hydrant accessories.
All valves shall comply with WIMES 8.09 Valves Issue 2 and the relevant clauses of Standard Specification S03 – Mechanical Engineering Issue 16, amended and/or clarified by the additional clauses detailed below.
Valve variants shall be available for drinking water and non-drinking water applications and shall cover both treatment and network installations.
Valves shall be suitable for the working pressure of the pipe for which they are intended and shall also be capable of withstanding a negative pressure of 0.8 bar below atmospheric pressure at temperatures up to 20 degrees centigrade.
All penstocks shall comply with the relevant clauses of WIMES 8.10 Penstocks, Stopgates, Stoplogs and Handstops Issue 2.
The company also requires;
The Supplier shall be able to provide all the ancillary components necessary to complete a specific installation. These shall typically include coping brackets, operating pillars and handwheels, chain operated handwheels, gearboxes, extended spindles with spindle guide brackets, spindle protection tubes, obturator position indicators, underground installation sets with protection tubes and surface boxes.
.
Coping brackets, operating pillars, guide brackets and protection tubes shall be manufactured in cast iron, SG Iron or fabricated carbon steel.
Extended spindles and muff couplings shall be manufactured in stainless steel or suitably protected carbon steel.
Surface boxes shall be manufactured in cast iron or SG iron.
When required, a close coupled top flange shall be provided to allow direct mounting of a gearbox or actuator. A keyed fixing shall be used to connect the spindle to the drive and the valve spindle shall be fully enclosed when the input device is mounted.
When an actuated valve is required, the Supplier shall liaise with the Kit Framework Suppliers for Electric Actuators. The Supplier shall be responsible for ensuring that the correct actuator for the duty is provided. Actuators shall be fitted at the valve suppliers works and the assembly tested to ensure correct interfacing and operation before delivery to site. Where appropriate, the actuator and valve components shall be match-marked and labelled to ensure correct re-assembly on site. The Valve Supplier shall provide all the fixings and fittings required to enable the actuator to be fitted.
–
Lot nr.: 1
Gate valves
The supply of Gate valves
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 2
Butterfly valves
The supply of Butterfly valves
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 3
Non return valves
The supply of Non return valves
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 4
Air / gas release valves
The supply of Air / gas release valves
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 5
Plug valves
The supply of Plug valves
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 6
Fire hydrants
The supply of Fire hydrants
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 7
Penstocks
The supply of Penstocks
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 8
In line check valves
The supply of In line check valves (used on combined sewer overflow outfalls for example)
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
–
Lot nr.: 9
Valve and hydrant accessories
The supply of Valve and hydrant accessories
Duration contract start date : 31/07/2027 11:00:00 PM
Duration contract end date : 01/08/2030 10:59:59 PM
Buyer
United Utilities
Buyer
United Utilities
Open for offers
156 days left
Important dates
24 Nov - Publication date
30 Apr - Deadline
Unlock Full Access with Mercell Bidding Business Plus