2026/2779 - Framework agreement for service and maintenance of refrigeration plants and heat pumps in Oslo.
Sub-contract 1 - Oslo
A contract shall be signed in accordance with the following division: one contract for 20 properties in OsloThe aim of the framework agreement is to ensure the Directorate of Public Construction and Property access to planned and acute needs within service, troubleshooting, maintenance, replacement and assembly of cooling installations and heat pumps etc. arising in the operation and maintenance of the buildings: Service and maintenance work for installations heating and cooling installations, As well as troubleshooting Service and maintenance material for heating and cooling installations Replacement and assembly of heating and cooling installations (if needed) Work on systems with refrigerating mediaNewing system with refrigerated media Leakage inspections of F-gas Consultancy services for refrigerating media.
Sub-contract 2 - The Opera
A contract shall be signed in accordance with the following division: one contract for Daikin/McQuay-Machine cooling at the Opera in Oslo.McQuay (Daikin) WHS 306.3EdErQuay (Daikin) R-134a A framework agreement shall be signed for the following trade services: Service and maintenance work for installations heating and cooling installations, As well as troubleshooting Service and maintenance material for heating and cooling installations Replacement and assembly of heating and cooling installations (if needed) Work on installations with refrigerating mediaNewing system with refrigerated media Leakage control of F-gas Consultancy services for refrigerating media