Supply & Install of Modular Treatment Equipment: Preliminary, Primary Filtration and Fixed Film Biological Systems
Deadline:21 Aug 2026, 22:59
Tender information
East Riding of Yorkshire
North and North East Lincolnshire
Southampton
Portsmouth
Isle of Wight
Central Hampshire
South Hampshire
North Hampshire
East Merseyside
Liverpool
Sefton
Wirral
Lincolnshire
Kingston upon Hull, City of
Medway
Kent Thames Gateway
Mid Kent
East Kent
West Kent
York
Type
Contract
Procedure
Not given
Ref. number
ocds-h6vhtk-0671eb
Estimated value
£23,247,000
Contract type
Framework agreement
Duration
13/12/2026 - 14/12/2029
Renewals
15/12/2029 - 14/12/2030
15/12/2030 - 14/12/2031
This tender process is for the provision of Supply & Install of Modular Treatment Equipment: Fixed‑Film Biological, Preliminary and Primary Filtration Systems. A summary of the scope across all Lots forming part of this tender is stated below.
The Modular Treatment framework will consist of suppliers who have the ability to design, supply & install containerised assets on a flatbed vehicle as a standalone solution either be removed via roll on/roll off functionality or craneage.
This framework will also consider semi modular assets which are assembled/installed by the asset supplier and involve greater civil complexity due to these assets requiring partial burying, but typically without the requirement for additional shuttering that´s associated with traditional concrete assets.
These assets will either be purchased by the Utilities directly and the novated or free issued to the Utilities Capital Construction supply chain partners.
–
Lot nr.: 1
Modular, Preliminary Treatment Solutions
he Goods to be supplied under this Agreement shall comprise modular inlet screening solutions, with optional grit and/or FOG removal modules, for applications up to 100 l/s.
The Supplier shall work with the Client to develop and finalise site-specific proposals under each Call Off Contract based on information provided by the Client. Solutions shall be containerised, modular, quick to install, durable, and designed to minimise operational and maintenance requirements, while enabling safe operation, monitoring, and integration with existing control and SCADA systems.
Where required, solutions may also include grit removal, FOG removal, screenings dewatering, and associated ancillary equipment. All materials, equipment, and components supplied shall be new, fit for purpose, compliant with relevant
British/European Standards, WIMES requirements, and OEM specifications. Full technical requirements, performance criteria, and detailed specifications are contained within the Technical Specification issued as part of the PQQ documentation.
Duration contract start date : 14/12/2026 12:00:00 AM
Duration contract end date : 14/12/2029 11:59:59 PM
Criteria definitions: Quality: 60 (Quality)
Quality: 10 (Sustainability)
Cost: 30 (Price)
–
Lot nr.: 2
Modular Primary Filtration Solutions
The Goods to be supplied under this Agreement shall comprise modular primary filtration solutions, using belt or drum filters as an alternative to primary settlement tanks, for applications up to 100 l/s.
The Supplier shall work with the Client to develop and finalise site-specific proposals under each Call Off Contract based on information provided by the Client. Solutions shall be capable of achieving the required suspended solids removal performance, operate with minimal manual intervention, and include all necessary ancillary equipment, controls, sludge handling, monitoring, and SCADA integration to support reliable operation.
Depending on site requirements, solutions may also include redundancy, flow balancing, wash water systems, FOG mitigation measures, and long-term service support. All materials, equipment, and components supplied shall be new, fit for purpose, compliant with relevant British/European Standards, WIMES requirements, and OEM specifications.
Full technical requirements, performance criteria, and detailed specifications are contained within the Technical Specification issued as part of the PQQ documentation.
Duration contract start date : 14/12/2026 12:00:00 AM
Duration contract end date : 14/12/2029 11:59:59 PM
Criteria definitions: Quality: 60 (Quality)
Quality: 10 (Sustainability)
Cost: 30 (Price)
–
Lot nr.: 3a
Modular, Fixed-film Biological Treatment Solutions - Secondary
he Goods to be supplied under this Agreement shall comprise modular fixed-film biological treatment solutions, including Submerged Aerated Filters (SAFs) and Moving Bed Biofilm Reactors (MBBRs), for secondary BOD reduction and secondary or tertiary ammonia removal.
The Supplier shall work with the Client to develop and finalise site-specific proposals under each Call Off Contract based on information provided by the Client. Solutions shall be modular, containerised where appropriate, designed for efficient installation and operation, and include all necessary process equipment, controls, monitoring, sludge management, aeration requirements, and SCADA integration to achieve the required treatment performance across the specified population equivalent ranges.
Depending on site requirements, solutions may also include blower systems, dissolved oxygen monitoring, multiple treatment zones, flow balancing, and parallel treatment arrangements. All materials, equipment, and components supplied shall be new, fit for purpose, compliant with relevant British/European Standards, WIMES requirements, and OEM specifications.
Full technical requirements, performance criteria, sizing criteria, and detailed specifications are contained within the Technical Specification issued as part of the PQQ documentation.
Duration contract start date : 14/12/2026 12:00:00 AM
Duration contract end date : 14/12/2029 11:59:59 PM
Criteria definitions: Quality: 60 (Quality)
Quality: 10 (Sustainability)
Cost: 30 (Price)
–
Lot nr.: 3b
Modular, Fixed-film Biological Treatment Solutions - Tertiary & Alternating and non alternating
The Goods to be supplied under this Agreement shall comprise modular fixed-film biological treatment solutions, including Submerged Aerated Filters (SAFs) and Moving Bed Biofilm Reactors (MBBRs), for tertiary ammonia removal applications up to a nominal population equivalent of 15,000 PE.
The Supplier shall work with the Client to develop and finalise site-specific proposals under each Call Off Contract based on information provided by the Client. Solutions shall be modular, containerised where appropriate, designed for efficient installation and operation, and include all necessary process equipment, controls, monitoring, aeration, sludge management, and SCADA integration to achieve the required treatment performance. Depending on site requirements, solutions may also include blower systems, dissolved oxygen monitoring, multiple treatment zones, flow balancing, and parallel treatment arrangements.
All materials, equipment, and components supplied shall be new, fit for purpose, compliant with relevant British/European Standards, WIMES requirements, and OEM specifications.
Full technical requirements, performance criteria, population equivalent sizing bands, and detailed specifications are contained within the Technical Specification issued as part of the PQQ documentation.
Duration contract start date : 14/12/2026 12:00:00 AM
Duration contract end date : 14/12/2029 11:59:59 PM
Criteria definitions: Quality: 60 (Quality)
Quality: 10 (Sustainability)
Cost: 30 (Price)
Buyer
Severn Trent Water Limited
Documents
Buyer
Severn Trent Water Limited
Deadline passed
Important dates
24 Jul - Publication date
21 Aug - Deadline
Unlock Full Access with Mercell Bidding Business Plus