Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Deadline:17 Aug 2026, 11:00
Tender information
Border
Type
Contract
Procedure
Open procedure
Estimated value
€400,000
Duration
5 months
Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.
Buyer
Donegal County Council_1193
Documents
Buyer
Donegal County Council_1193
Open for offers
31 days left
Important dates
16 Jul - Publication date
17 Aug - Deadline
Unlock Full Access with Mercell Bidding Business Plus