Demolition & Structural Alterations

Deadline:27 Aug 2026, 22:59

Summary
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Tender information
Harrow and Hillingdon
Merton, Kingston upon Thames and Sutton
Barking & Dagenham and Havering
Hackney and Newham
Hounslow and Richmond upon Thames
Redbridge and Waltham Forest
Tower Hamlets
Camden and City of London
Enfield
Haringey and Islington
Westminster
Lewisham and Southwark
Kensington & Chelsea and Hammersmith & Fulham
Lambeth
Wandsworth
Barnet
Brent
Bromley
Ealing
Croydon
Type
Contract
Procedure
Not given
Ref. number
40011.01
Estimated value
£7,254,744
Duration
22/09/2026 - 27/10/2027
All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e. Structural Steelwork), including padstones and steel bearing plates; All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs, underpinning, pads, ramps, slabs and upstands; All dry packing, grouting, and encasement to steel members, including those installed by Others; Attendance and return visits required for the above installs by Others; External Luxcrete repairs; CCTV and repairs of existing below ground drainage. CCTV of new drainage; Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor); Where shown in package split, all new primary and secondary steelwork, connections, metal deck, intumescent coating, padstones, steel bearing plates and dry packing; Alterations to existing structure including formation of new risers and services penetrations, box frames and trimmer steels and timbers; 3rd party review and confirmation of any intumescent and fire stopping installs; Forming of all new lift pits including underpinning, reinforcement and waterproof concrete; Installation of all waterproofing, blinding, insulation and sump (including commissioning) requirements; Facade and party wall retention propping to facilitate demolition Works; Demolition of existing stairwell in the East Wing including all associated temporary works, and infill of new landing; All blockwork and brick walls as shown in package split including windposts; Form new openings including lintels, beams, posts; Re-levelling of existing floor substrates; Removal and excavation of existing screed and slabs, including localised repaires where required; Covering or edge protection install to all voids and openings formed by the Works; Installation of riser flooring systems to all newly formed and existing riser opening; Strengthening of existing beams, including services opening coordination and formation; Removal or containment of any asbestos (e.g. Strand buildings timber flooring), lead, guano and anthrax where required to complete the Works, with appropriate measures in place; Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles, fireplaces and hearths; Removal of existing heritage windows following surveys by Others; Installation of tower crane base including piles and cap; Fire and corrosion protection to steel in-situ application (new only); Temporary & permanent steel bracing; Protection of all existing heritage finishes (where at risk of damage from the works); All scaffolding and crash decks to facilitate the works (e.g. Strand south facade elevation); Propping of existing vaults at Strand; Underslab drainage works and GRP sumps; Surveys of existing structure, looking ahead on programme to avoid last minute discoverables; Install of gulleys, manhole covers and associated below-ground drainage components;
Buyer
COURTAULD INSTITUTE OF ART
buyer-email@mail.com
organization number

Documents

Document name
Upload date
File size
First document.pdf1 Jan 1970, 00:001 Bytes
Second document.pdf1 Jan 1970, 00:001 Bytes
Deadline passed
Important dates
14 Jul - Publication date
27 Aug - Deadline
Unlock Full Access with Mercell Bidding Business Plus
Start your free trial to explore exclusive features that help you win more tenders, faster:
AI-Powered Tender Insights
Buyer Contact Info
Key Tender Timelines

Already have an account?

Your privacy is important to us

We use cookies to improve your experience and evaluate each item on our site. By clicking further, you accept our use of cookies.